Back to News

Flintco Saves Owner Money, Delivers Certainty with Thermal and Laser Scanning Technology

Central New Mexico Community College in Albuquerque chose Flintco to deliver the $22.9 million addition and renovation of the 5-story Max Salazar Hall in part because of the company’s proposed use of self-performed drone flights and thermal and advanced laser scanning technology during preconstruction. The design provides additional instructional space and a “new front door” to better serve the college’s 33,000 students (opening December 2019). The 90,000 SF renovation and 11,000 SF entrance addition to the ‘90s era building is slated for a LEED Silver certification.

Flintco’s “virtual” approach during preconstruction verified the integrity of the building exterior by using a drone and thermal scanning technology. Timing for thermal scans is critical: Flintco conducted the scans in December when outside temperatures dropped, and inside building temperature were at maximum. Warm, pressurized air from inside a building naturally escapes, creating yellow exterior “hot spots” that contrast against the building’s cold “blue” surface. Our team confirmed existing building hot spots as expected at seals around windows and doors and at the top of parapets where heat rises. The building’s minor escaping air was easily corrected with routine maintenance. Once interior demolition was complete, our virtual design and construction team moved inside, self-performing both Matterport and BLK laser scanning technologies. Using the different scanners in tandem meant our team could find and correct structural model variations, allowing us to modify coordinated models instead of finding the issue in the field and sending RFIs to initiate design revisions. Because we modeled the precise locations of remaining chilled water lines and ductwork before starting renovations, we avoided costly rework – savings that accrued to the owner. Eliminating rework also has a direct correlation with delivering an incident and in jury free workplace.


Related Articles

Projects

Oklahoma State University Pilot Project Leads to Creation of Lean2.0

November 19, 2018
There were many Lean “firsts” associated with the $28.5 million, 65,633 SF Oklahoma State University CEAT Undergraduate Laboratory, which provides students opportunities to learn basic engineering principles at a small scale. For the first time: Trade partners atten...
Read More
Projects

Flintco Delivers Faster Schedule with Off-Site Prefabrication, Better Space Planning for Cherokee Nation Central Utility Plant

November 08, 2018
Construction of the $149 million, 469,000 SF Cherokee Nation Outpatient Health Clinic (CNOHC) in Tahlequah, OK, is the largest full service Native American healthcare facility in the country. The CNOHC is our 2nd Lean pilot project. The project team recognized schedule ...
Read More
Projects

Flintco to Build WPX Headquarters in Downtown Tulsa

July 27, 2019
Like Flintco, WPX Energy has a rich history in Tulsa. With Tulsa’s economic and cultural development at the forefront, Flintco is honored to be a part of this transformational project for WPX and the downtown Tulsa area. WPX’s new headquarters includes 245,000 SF of...
Read More