PROJECT DETAILS
Vibration Lab Boulder
PROJECT DETAILS
The Vibration Lab project includes installation of specialized materials and systems to support a new crane and vibration testing laboratory within a highly sensitive operational environment. Scope of work includes installation of new mechanical equipment, ductwork, and piping in the basement with support slabs for air isolators and steel supports for the inertial mass system; construction of a multi-level steel superstructure housing the AMP and Control Rooms; sanitary sewer tie-in for a new restroom; installation of a new crane in the UCA Storage area; selective demolition and structural reinforcement of the west Titan Chamber; and installation of a new penthouse AHU set by crane.
*The photos shown are not of the specific project due to confidentiality but are indicative of the spaces in which Flintco performs work.
- Market
- Advanced Industries
- Size
- 51,815 SF
- Project Owner
- Confidential
- Architect
- Treanor HL