Advanced Industries

Vibration Lab Boulder

Boulder, CO

PROJECT DETAILS

Vibration Lab Boulder

The Vibration Lab project includes installation of specialized materials and systems to support a new crane and vibration testing laboratory within a highly sensitive operational environment. Scope of work includes installation of new mechanical equipment, ductwork, and piping in the basement with support slabs for air isolators and steel supports for the inertial mass system; construction of a multi-level steel superstructure housing the AMP and Control Rooms; sanitary sewer tie-in for a new restroom; installation of a new crane in the UCA Storage area; selective demolition and structural reinforcement of the west Titan Chamber; and installation of a new penthouse AHU set by crane.

*The photos shown are not of the specific project due to confidentiality but are indicative of the spaces in which Flintco performs work.

Market
Advanced Industries
Size
51,815 SF
Project Owner
Confidential
Architect
Treanor HL

TESTIMONIALS

More Projects.

  • Fisher Manufacturing (FM) Kathabar Replacement

    Boulder, CO
  • FM Coating and Applications Booth

    Boulder, CO
  • CAMI WiWaves Research Facility

    Oklahoma City, OK

You Bring The Vision.

We’ll Make It Happen.