Advanced Industries

Fisher Manufacturing (FM) Kathabar Replacement

Boulder, CO

PROJECT DETAILS

Fisher Manufacturing (FM) Kathabar Replacement

Flintco partnered with an aerospace manufacturing client to replace a critical Kathabar liquid desiccant dehumidification system serving cleanroom manufacturing and integration spaces. Phase 1 included installation of a new makeup air unit, steam generator, and DI water skid to provide temporary humidity-controlled air and maintain operations. Phase 2 consisted of replacement of the Kathabar unit, demolition and reconstruction of the Kathene containment, equipment, and penthouse slab, along with upgrades to associated hydronic piping and ductwork.

*The photos shown are not of the specific project due to confidentiality but are indicative of the spaces in which Flintco performs work.

Market
Advanced Industries
Size
24,475 SF
Project Owner
Confidential
Architect
G Squared Design

TESTIMONIALS

More Advanced Industries Projects.

  • Vibration Lab Boulder

    Boulder, CO
  • FM Coating and Applications Booth

    Boulder, CO
  • CAMI WiWaves Research Facility

    Oklahoma City, OK

You Bring The Vision.

We’ll Make It Happen.