Stability Delivered: On-Time Construction on Difficult Soil
Challenge The Fort Bend parking garage site presented significant geotechnical obstacles that threatened project feasibility and timeline. The southwest Houston location featured highly organic, clay-rich soil with excessive moisture—conditions that made traditional foundation systems impossible. The site was an old pasture with soil unsuitable for a drilled pier with a poured concrete foundation, which would…