Insights and Case Studies

    • Insights and Case Studies

    Jun 03 2024

    Innovating Construction with Firmus AI

    Read More
    • Insights and Case Studies

    May 15 2024

    From Legacy to Landmark: Safely Demolishing a Community Icon

    Challenge Flintco was tasked with delivering a 216,000 SF, state-of-the-art multipurpose coliseum on an active State Fairgrounds, with the historic Jim Norick Arena standing just feet away. Once the new coliseum opened, the beloved Jim Norick Arena would need to be imploded—without damaging the new facility or disrupting ongoing fairgrounds operations. Solution Planning began early….

    Read More
    • Insights and Case Studies

    Mar 08 2022

    Converting a 1940s Factory into a Modern Arts Venue

    Challenge The Momentary transforms a 65,000 SF former Kraft cheese factory into a dynamic arts destination with galleries, performance spaces, outdoor areas, and an artist-in-residence program that blends visual and performing arts, culinary experiences, and a relaxed, interactive visitor experience. Constructed in 1942 and abandoned for years, the structure presented significant challenges. Floors were uneven,…

    Read More
    • Insights and Case Studies

    Feb 11 2022

    Construction Layout Will Never Be the Same

    Flintco is an early adopter of the LightYX technology, which makes the layout process much more efficient, accurate, and integrated. The application and hardware use a visible laser to project plans on any surface for use during layout. Changes in the field are integrated into the plans electronically for approval by the design team, keeping…

    Read More
    • Insights and Case Studies

    Jan 11 2022

    Flintco Adopts New Construction Technology, Touchplan

    It’s always amazing to watch the speed of technology like Touchplan evolve and scale firsthand. The enterprise-wide agreement provides Flintco and their trade partners unlimited use of Touchplan’s intuitive daily planning software to improve certainty and predictability across all of their projects. Adopting new technology defines what we mean by continuous improvement and respect for others….

    Read More
    Large, open-walled metal pavilion with a gabled roof and concrete foundation, set in a grassy area under a clear blue sky, conveying spaciousness.
    • Insights and Case Studies

    Aug 20 2021

    Building the Lesson Plan: Turning Construction into a Living STEM Curriculum

    Challenge Broken Arrow Public Schools envisioned a 48,000 SF STEM Innovation Center where students could explore up to 140 disciplines through hands-on learning. The project required more than constructing a building; it needed to function as a teaching tool, with systems and construction processes that students could observe, analyze, and operate. Solution Flintco transformed the…

    Read More
    Modern hotel exterior at sunset, featuring a white facade with geometric black-framed windows. Pink lighting accents create a vibrant, welcoming ambiance.
    • Insights and Case Studies

    Jan 07 2020

    Building Through Crisis: Delivering Memphis’s Hyatt Centric Amid Pandemic Disruption

    Challenge In August of 2019, Flintco broke ground on the eight-story, 227-room Hyatt Centric Beale Street Memphis—a project blending contemporary hotel construction with the preservation of the historic 1878 Wm. C. Ellis & Sons Ironworks and Machine Shop. Working closely with local preservationists, the team planned to integrate salvaged industrial elements from the original blacksmith…

    Read More
    Spacious modern lobby with exposed brick walls, large staircase, and industrial lighting. Potted plants add greenery, creating a warm, inviting atmosphere.
    • Insights and Case Studies

    Nov 26 2019

    Using Laser Scanning to Protect Crews from High-Voltage Risk

    Challenge When high-voltage transmission lines intersect the envelope of an 11-story downtown tower, there is no margin for assumption. At the 222 North Detroit Office Building in Tulsa, Flintco identified a potential life-safety hazard early: three active 130-kilovolt high-voltage transmission lines running along the building’s east side. With the structure already framed and façade installation…

    Read More
    Spacious airport terminal with a glossy floor, empty modern seating area, and an illuminated walkway. Overhead signs guide travelers to gates and restrooms.
    • Insights and Case Studies

    Nov 26 2019

    Solving Hidden Utility Conflicts on a Live Airport Project

    Challenge Modernizing Concourse B at Memphis International Airport meant performing complex construction in a fully operational, high-security environment—where every delay creates a ripple effect on the client’s ongoing operations. Early site work revealed that existing underground utilities, including sanitary and sewer lines, were inaccurately documented, creating immediate risks to both the project schedule and airport…

    Read More
    Spacious modern atrium with high ceilings, large windows, and sleek design. White floors, suspended art piece, and potted trees add elegance.
    • Insights and Case Studies

    Jul 22 2019

    Engineering the Impossible: Building an Iconic Arena with No Identical Panels

    Challenge The BOK Center presented an architectural paradox: to create Cesar Pelli’s iconic vision for a 565,000 SF arena, with no two exterior walls sharing the same radius or geometry. The building’s envelope required thousands of one-of-a-kind components, including the centerpiece—an 80-foot cantilevered glass curtain wall comprising 60,000 square feet of custom-fabricated glass panels—each dimensionally…

    Read More
    • Insights and Case Studies

    Jan 29 2017

    Building Above: Expanding INTEGRIS Heart and ICU Hospitals Without Disruption

    Challenge Constructing a six-story, 206,000-SF heart and ICU hospital above an active parking garage and connecting it to the main hospital via a 10-story tower required detailed planning and precise execution to ensure zero disruptions to hospital operations. The existing garage could not support the vertical loads of the new construction, requiring a foundation solution…

    Read More