  • Building Through Crisis: Delivering Memphis’s Hyatt Centric Amid Pandemic Disruption

    Challenge In August of 2019, Flintco broke ground on the eight-story, 227-room Hyatt Centric Beale Street Memphis—a project blending contemporary hotel construction with the preservation of the historic 1878 Wm. C. Ellis & Sons Ironworks and Machine Shop. Working closely with local preservationists, the team planned to integrate salvaged industrial elements from the original blacksmith…

  • Using Laser Scanning to Protect Crews from High-Voltage Risk

    Challenge When high-voltage transmission lines intersect the envelope of an 11-story downtown tower, there is no margin for assumption. At the 222 North Detroit Office Building in Tulsa, Flintco identified a potential life-safety hazard early: three active 130-kilovolt high-voltage transmission lines running along the building’s east side. With the structure already framed and façade installation…

  • Solving Hidden Utility Conflicts on a Live Airport Project

    Challenge Modernizing Concourse B at Memphis International Airport meant performing complex construction in a fully operational, high-security environment—where every delay creates a ripple effect on the client’s ongoing operations. Early site work revealed that existing underground utilities, including sanitary and sewer lines, were inaccurately documented, creating immediate risks to both the project schedule and airport…

  • Engineering the Impossible: Building an Iconic Arena with No Identical Panels

    Challenge The BOK Center presented an architectural paradox: to create Cesar Pelli’s iconic vision for a 565,000 SF arena, with no two exterior walls sharing the same radius or geometry. The building’s envelope required thousands of one-of-a-kind components, including the centerpiece—an 80-foot cantilevered glass curtain wall comprising 60,000 square feet of custom-fabricated glass panels—each dimensionally…