Industrial

OSU Central Plant & Power Distribution Upgrade

Stillwater, OK

Industrial facility interior with large machinery, vibrant orange and blue pipes, and control panels. Steel beams and overhead lights create a clean, organized setting.

PROJECT DETAILS

OSU Central Plant & Power Distribution Upgrade

The central utility plant serves 10 million SF across the OSU–Stillwater campus, delivering reliable steam and chilled water to 82 buildings. High-capacity boilers and chillers support heating, cooling, and process needs through an extensive underground distribution network. Designed as both infrastructure and a teaching tool, the facility includes an 80-seat classroom and an observation deck overlooking plant operations. The project also modernizes the campus electrical distribution system with increased voltage capacity, underground duct banks, and a new 12,000 SF power distribution center that includes a hardened basement electrical vault designed to withstand F3 winds, strengthening resilience and supporting the university’s long-term growth.

Market
Industrial
Size
85,000 SF
Project Owner
Oklah oma State University
Architect
Frankfurt Short Bruza
Awards

2019 ABC Excellence Award


TESTIMONIALS

More Industrial Projects.

  • A large, beige building with a flat white roof, surrounded by a chain-link fence. Air conditioning units line the side. Trees and red-roofed structures are in the background.

    Hazardous Waste Facility at the University of Texas San Antonio

    San Antonio, TX
  • UT Austin Chilling Station #7

    Austin, TX
  • Aerial view of an industrial site with two large white dome structures connected by a conveyor system, surrounded by green fields and storage tanks.

    SESCO/BBM Cement Terminal

    Houston, TX

You Bring The Vision.

We’ll Make It Happen.